Construction of a new Passenger Terminal 

 

Currently, the current passenger terminals have a passenger processing capacity of 3,5 million passengers, but during the peak hours of the flight schedule, there is congestion, especially in the security control area and the regrouping areas. passengers. 

One of the objectives of the Avram Iancu Cluj RA International Airport development strategy to reach the threshold of 7 million passengers in 2040, is the construction of a new passenger terminal.

The duration of the construction of the new terminal, as well as the period during which the works will be carried out, will be determined in a Feasibility Study.  

Construction of a new runway of 3.500 m

ÎIn 2011, work began on the construction of a new runway at the International Airport Avram Iancu Cluj. The works started to build the first 2.100 m of the runway constituted the first stage of the yearof the investment target "3.500 m runway - landing at Avram Iancu Cluj International Airport".  

The 2.100 m track inaugurated in 2013 was the first track built in Romania in the last 50 years, with a width of 45 m and up to 60 m with approaches. 

The second stage of the project, i.e. the extension from 2.100m to 3.420m will allow intercontinental flights, but the start of the execution of the runway expansion works depends on the expropriation of land by the Cluj County Council and the diversion of the Someșul Mic river by the Romanian National Water Administration.

Infrastructure development for intermodal transport of passengers and goods

Both at European and national level, intermodal transport is seen as a sustainable and efficient mobility solution from the point of view of the resources involved, especially in terms of freight transport.

For this investment objective, the technical documentation was developed, through the implementation of the project "Studies for the development of the intermodal transport infrastructure for passengers and goods", a project for which non-reimbursable European funding was received, through the TEN-T program. (Trans-European Transport Network).

The realization of a terminal dedicated to this type of transport will encourage the increase of cargo traffic at the airport, the number of passengers and the amount of goods transported over long distances and the reduction of transport times over these distances, as well as the economic development of the region.

Construction of a new control tower in collaboration with ROMATSA

 With the completion of the new 3.500m runway, the construction of a new control tower will be required, taking into account the visibility required by air traffic controllers, the obstacle plan and the access possibilities of special vehicles in case of intervention. The new control tower will aim to ensure the security of air traffic and to visually supervise airport activities over a much larger area. International Airport Avram Iancu Cluj together with ROMATSA and the selected designer will identify the optimal location for the new Control Tower, so as to ensure ROMATSA's requirements regarding the usable area, visibility on the movement surface, separate access and parking for vehicles, without affecting the future development projects of the airport.

Photovoltaic park

The use of green energy to meet the energy needs of the airport aims to reduce costs by using renewable energy production sources with technologies that have high efficiency and to meet the requirements established by the Kyoto protocol in terms of reducing carbon emissions .

The project focuses on the realization of a photovoltaic park in the perimeter of the airport with an installed power of at least 2MW in order to produce electricity from renewable sources. 

 

East parking lot development at Avram Iancu Cluj RA International Airport

Avram Iancu Cluj International Airport RA, owner of the project East parking lot development at Avram Iancu Cluj International Airport RA, Cluj-Napoca, Traian Vuia Street, Apahida commune, CF no. 265841, 345755, Cluj County, announces to the interested public that the decision of the framing stage has been taken by DJM Cluj, within the environmental impact assessment procedure, for the project East parking lot development at Avram Iancu Cluj International Airport RA, Traian Vuia Street, Apahida commune, CF no. 265841, 345755, Cluj County. The draft framing decision and the reasons that substantiate it can be consulted at the DJM Cluj headquarters, Calea Dorobanților no. 99, Monday-Friday between 9:00 a.m. and 2:00 p.m., as well as at the following internet address  http://djmcj.anmap.gov.roThe interested public may submit comments/observations on the draft classification decision within 10 days from the date of publication of the announcement on the website of DJM Cluj. http://djmcj.anmap.gov.ro/
 

Lighting at the stage II platform, on the East side

The design and installation of piers containing nacelles with night-time lighting reflectors for the passenger boarding platform is being considered.